|
S. Subramanian, R. Anandhakumar and S. Ganesan, "Artificial bee colony based solution technique for generator maintenance scheduling .", Australian journal of Electrical and Electronics Engineering , Volume 09, Number 02, Aug 2012, pp. 109-126. 2012. | |
|
R. Anandhakumar, S. Subramanian, and S. Ganesan, "ABC algorithm to thermal units maintenance.", Journal of computer science and engineering, Volume 08, Number 01, Aug 2011, pp. 21-31. 2011. | |
|
R. Anandhakumar, S. Subramanian, and S. Ganesan, "Artificial bee colony algorithm to generator maintenance scheduling in competitive market.", International journal of computer application , Volume 31, Number 09, Sep 2011, pp. 44-53. 2011. | |
|
R. Anandhakumar, S. Subramanian, and S. Ganesan, "Modified ABC algorithm for generator maintenance scheduling.", International journal of computer and electrical engineering , Volume 03, Number 06, Dec 2011, pp. 812-819. 2011. | |
|
S. Subramanian, R. Anandhakumar and S. Ganesan, "Generator maintenance management using bio-inspired search algorithm.", International journal of Energy Sector Management , Volume 05, Number 04, Nov 2011, pp. 522-544. 2011. | |
|
R. Anandhakumar and S. Subramanian, "Economic dispatch with multiple fuel options using CCF.", Energy and power engineering , Volume 03, Number 02, May 2011, pp. 113-119. 2011. | |
|
S. Subramanian and R. Anandhakumar, "Dynamic economic load dispatch solution using composite cost function.", International review of electrical engineering, Volume 05, Number 04, Aug 2010, pp. 1664-1669. 2010. | |
|
Srikrishna Subramanian and Radhakrishnan Anandhakumar, "Composite cost function based solution to the unit commitment problem.", Smart grid and renewable energy, Volume 01, Number 02, Aug 2010, pp. 88-97. 2010. | |